
The Bay Model was built in two stages (mid-'50's, late '60's). Like most of us that have passed the mid-century age mark, it is a bit creaky. Recently, the Pacific Ocean section of the Model was leaking, but a patch job got it back in operation just about two hours before the Meandering group tour last week. Unfortunately, the patch job hasn't been fully successful, so the Model is temporarily shut down once again. Hopefully, the latest round of repairs will be complete and the Model will be up and running again by the end of next week. (If not, Dick will lead an "Ice Age" tour --- what San Francisco Bay looked like before the ice cap melted and flooded the Bay with salt water).
No comments:
Post a Comment